An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times (Q1761844): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q163558
RedirectionBot (talk | contribs)
Changed an Item
Property / author
 
Property / author: Shi, Leyuan / rank
 
Normal rank

Revision as of 23:05, 9 February 2024

scientific article
Language Label Description Also known as
English
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
scientific article

    Statements

    An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times (English)
    0 references
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    capacitated multi-level lot-sizing
    0 references
    relax-and-fix
    0 references
    MIP-based interval heuristic
    0 references
    linear programming
    0 references

    Identifiers