Approximation algorithms for two-stage flexible flow shop scheduling (Q2292124): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 07:36, 5 March 2024

scientific article
Language Label Description Also known as
English
Approximation algorithms for two-stage flexible flow shop scheduling
scientific article

    Statements

    Approximation algorithms for two-stage flexible flow shop scheduling (English)
    0 references
    0 references
    0 references
    0 references
    3 February 2020
    0 references
    This paper deals with a two-stage flexible flow shop problem with a single machine at the first stage and \(m\) identical parallel machines at the second stage. The optimization criterion is the minimization of the makespan. First, a \((2 + \epsilon)\)-approximation algorithm is given. Then a 3-approximation and an \((2.5 + \epsilon)\)-approximation algorithm are given for the case when contiguous addresses are required at the second stage. In addition, the special cases with two and three identical parallel machines are considered, and approximation algorithms with a ratio of 2.5 and 2.67, respectively, are given which can be applied both to the contiguous and noncontiguous cases. The paper concludes with a new lower bound on the optimal function value.
    0 references
    0 references
    scheduling
    0 references
    flexible flow shop
    0 references
    identical parallel machines
    0 references
    approximation algorithm
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references