A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (Q579120): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/0305-0548(87)90033-5 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2037003659 / rank | |||
Normal rank |
Revision as of 14:39, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden |
scientific article |
Statements
A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (English)
0 references
1987
0 references
The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem.
0 references
job earliness
0 references
measure of inventory costs
0 references
single machine scheduling
0 references
flowtime
0 references