Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.amc.2006.05.106 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2023176163 / rank | |||
Normal rank |
Revision as of 21:28, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case |
scientific article |
Statements
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
0 references
13 February 2007
0 references
flexible flow line
0 references
lot scheduling
0 references
metaheuristics
0 references
finite horizon
0 references
limited intermediate buffers
0 references