Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2006.05.106 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2023176163 / rank
 
Normal rank

Revision as of 21:28, 19 March 2024

scientific article
Language Label Description Also known as
English
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
scientific article

    Statements

    Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
    0 references
    0 references
    13 February 2007
    0 references
    flexible flow line
    0 references
    lot scheduling
    0 references
    metaheuristics
    0 references
    finite horizon
    0 references
    limited intermediate buffers
    0 references

    Identifiers