The two-machine flowshop scheduling problem with total tardiness (Q1115798): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0305-0548(89)90005-1 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2161087400 / rank
 
Normal rank

Revision as of 00:55, 20 March 2024

scientific article
Language Label Description Also known as
English
The two-machine flowshop scheduling problem with total tardiness
scientific article

    Statements

    The two-machine flowshop scheduling problem with total tardiness (English)
    0 references
    0 references
    0 references
    0 references
    1989
    0 references
    This paper considers the criterion of minimizing total job tardiness in the two-machine flowshop system. The conditions that determine which of a pair of adjacent jobs in a sequence should precede the other to minimize total job tardiness are derived. A branch-and-bound solution procedure to reach an optimal solution to the problem is developed. A simple and computationally efficient heuristic is also presented. Moreover, an illustrative example together with the computational characteristics of the algorithm and the heuristic is provided.
    0 references
    0 references
    total job tardiness
    0 references
    two-machine flowshop
    0 references
    branch-and-bound
    0 references
    heuristic
    0 references
    0 references