On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown (Q1630160): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2013.10.047 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2044196582 / rank
 
Normal rank

Revision as of 00:58, 20 March 2024

scientific article
Language Label Description Also known as
English
On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown
scientific article

    Statements

    On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown (English)
    0 references
    0 references
    0 references
    7 December 2018
    0 references
    EPQ
    0 references
    optimization
    0 references
    convexity
    0 references
    production
    0 references
    breakdowns
    0 references
    rework
    0 references

    Identifiers