Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines (Q2825621): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.7494/dmms.2013.7.1.43 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2117558077 / rank | |||
Normal rank |
Latest revision as of 00:09, 20 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines |
scientific article |
Statements
Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines (English)
0 references
13 October 2016
0 references
production planning
0 references
lot-sizing and scheduling
0 references
mixed integer programming
0 references