A goal approach to assembly line balancing (Q2639768): Difference between revisions
From MaRDI portal
Created a new Item |
Added link to MaRDI item. |
||
links / mardi / name | links / mardi / name | ||
Revision as of 10:22, 3 February 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A goal approach to assembly line balancing |
scientific article |
Statements
A goal approach to assembly line balancing (English)
0 references
1990
0 references
The problem considered is one of assembly line balancing. The authors introduce a new model of the problem which allows for the flexibility to simultaneously consider variations in cycle time, number of workstations, zoning constraints, idle time and cost. A zero-one goal program is developed that allows the system designer to consider multiple criteria in selecting a preferred schedule.
0 references
assembly line balancing
0 references
variations in cycle time
0 references
zoning constraints
0 references
idle time
0 references
zero-one goal program
0 references