An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times (Q1761844): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic approach for big bucket multi-level production planning problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncapacitated lot-sizing: The convex hull of solutions / rank
 
Normal rank
Property / cites work
 
Property / cites work: bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4139966 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging / rank
 
Normal rank

Latest revision as of 21:01, 5 July 2024

scientific article
Language Label Description Also known as
English
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
scientific article

    Statements

    An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times (English)
    0 references
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    capacitated multi-level lot-sizing
    0 references
    relax-and-fix
    0 references
    MIP-based interval heuristic
    0 references
    linear programming
    0 references

    Identifiers