Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates (Q1001006): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Deteriorating Jobs on a Single Processor / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with time dependent processing times: Review and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity analysis of job-shop scheduling with deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time in a two-machine flow shop with deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow shop scheduling problems with deteriorating jobs under dominating machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4055377 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review and classification of heuristics for permutation flow-shop scheduling with makespan objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparison of heuristics for flowtime minimisation in permutation flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic algorithm for mean flowtime objective in flowshop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constructive and composite heuristic solutions to the \(P\|\sum C_i\) scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for continuous flow-shop problem / rank
 
Normal rank

Latest revision as of 02:10, 29 June 2024

scientific article
Language Label Description Also known as
English
Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates
scientific article

    Statements

    Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates (English)
    0 references
    0 references
    12 February 2009
    0 references
    0 references
    flow shop
    0 references
    deteriorating jobs
    0 references
    scheduling
    0 references
    total completion time
    0 references
    0 references