An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem (Q2255903): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A fast heuristic for quay crane scheduling with interference constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving rich quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with spatial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithm Theory - SWAT 2004 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures / rank
 
Normal rank
Property / cites work
 
Property / cites work: The quay crane scheduling problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for the quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with non-crossing constraint / rank
 
Normal rank

Latest revision as of 16:38, 9 July 2024

scientific article
Language Label Description Also known as
English
An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
scientific article

    Statements

    An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    18 February 2015
    0 references
    (S) scheduling
    0 references
    port container terminal
    0 references
    unidirectional quay crane scheduling problem
    0 references
    mathematical formulation
    0 references

    Identifiers