A bicriteria flowshop scheduling problem with setup times (Q865584): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Sequency on two and three machines with setup, processing and removal times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job lateness in a two-machine flowshop with setup times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine group scheduling problem with blocking and anticipatory setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in stochastic flowshops with independent setup, processing and removal times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job lateness in flowshops with setup and removal times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop and Jobshop Schedules: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Future paths for integer programming and links to artificial intelligence / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. / rank
 
Normal rank

Revision as of 14:03, 25 June 2024

scientific article
Language Label Description Also known as
English
A bicriteria flowshop scheduling problem with setup times
scientific article

    Statements

    A bicriteria flowshop scheduling problem with setup times (English)
    0 references
    0 references
    0 references
    19 February 2007
    0 references
    flowshop scheduling
    0 references
    bicriteria
    0 references
    setup times
    0 references
    integer programming
    0 references
    heuristic methods
    0 references

    Identifiers