Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (Q1712074): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Formulating and solving sustainable stochastic dynamic facility layout problem: a key to sustainable operations / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A semidefinite optimization-based approach for global optimization of multi-row facility layout / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: An overview of bilevel optimization / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Genetic algorithm for mixed integer nonlinear bilevel programming and applications in product family design / rank | |||
Normal rank |
Revision as of 22:07, 17 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout |
scientific article |
Statements
Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (English)
0 references
21 January 2019
0 references
Summary: The flexible job shop scheduling problem (FJSSP) and multi-row workshop layout problem (MRWLP) are two major focuses in sustainable manufacturing processes. There is a close interaction between them since the FJSSP provides the material handling information to guide the optimization of the MRWLP, and the layout scheme affects the effect of the scheduling scheme by the transportation time of jobs. However, in traditional methods, they are regarded as separate tasks performed sequentially, which ignores the interaction. Therefore, developing effective methods to deal with the multi-objective energy-aware integration of the FJSSP and MRWLP (MEIFM) problem in a sustainable manufacturing system is becoming more and more important. Based on the interaction between FJSSP and MRWLP, the MEIFM problem can be formulated as a multi-objective bi-level programming (MOBLP) model. The upper-level model for FJSSP is employed to minimize the makespan and total energy consumption, while the lower-level model for MRWLP is used to minimize the material handling quantity. Because the MEIFM problem is denoted as a mixed integer non-liner programming model, it is difficult to solve it using traditional methods. Thus, this paper proposes an improved multi-objective hierarchical genetic algorithm (IMHGA) to solve this model. Finally, the effectiveness of the method is verified through comparative experiments.
0 references
integration of FJSSP and MRWLP
0 references
bi-level programming model
0 references
improved multi-objective hierarchical genetic algorithm
0 references
energy consumption
0 references
0 references
0 references