Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.amc.2006.05.106 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.AMC.2006.05.106 / rank | |||
Normal rank |
Latest revision as of 06:01, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case |
scientific article |
Statements
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
0 references
13 February 2007
0 references
flexible flow line
0 references
lot scheduling
0 references
metaheuristics
0 references
finite horizon
0 references
limited intermediate buffers
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references