A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (Q693472): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
Property / DOI
 
Property / DOI: 10.1016/j.apm.2011.10.032 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.APM.2011.10.032 / rank
 
Normal rank

Revision as of 07:14, 9 December 2024

scientific article
Language Label Description Also known as
English
A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
scientific article

    Statements

    A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (English)
    0 references
    0 references
    0 references
    0 references
    7 December 2012
    0 references
    multi-cyclic scheduling
    0 references
    robotic flowshop
    0 references
    mixed integer programming
    0 references
    time window constraints
    0 references
    \texttt{CPLEX}
    0 references

    Identifiers