A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
From MaRDI portal
(Redirected from Publication:693472)
Recommendations
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
- Cyclic scheduling in robotic flowshops with bounded work-in-process levels
- Cyclic scheduling of parts and robot moves in m-machine robotic cells
- Cyclic scheduling in robotic flowshops
- Cyclic Scheduling of Identical Parts in a Robotic Cell
Cites work
- An algorithm for hoist scheduling problems
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Cyclic hoist scheduling in large real-life electroplating lines
- Minimizing the fleet size with dependent time-window and single-track constraints
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm
- The coordination of transportation and batching scheduling
- Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
Cited in
(20)- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
- Scheduling robotic cells with fixed processing times or time windows: classification, solution approaches, polynomial algorithms and complexity
- A mixed integer programming formulation for the total flow time single machine robust scheduling problem with interval data
- Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times
- Robust optimization for the cyclic hoist scheduling problem
- A mixed integer programming model for the cyclic job-shop problem with transportation
- Cyclic scheduling of parts and robot moves in m-machine robotic cells
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance
- Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization
- Robotic flow shop scheduling problem with combined buffer conditions
- Cyclic scheduling in robotic flowshops with bounded work-in-process levels
- Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
- A scheduling model of logistics service supply chain based on the time windows of the FLSP's operation and customer requirement
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows
- Multi-machine scheduling with interval constrained position-dependent processing times
This page was built for publication: A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q693472)