Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints
From MaRDI portal
Publication:5888201
DOI10.1080/03155986.2001.11732435OpenAlexW2405404728MaRDI QIDQ5888201
Publication date: 24 April 2023
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03155986.2001.11732435
Related Items (7)
Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows ⋮ Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance ⋮ A dynamic scheduling approach for optimizing the material handling operations in a robotic cell ⋮ Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint ⋮ Steady state analysis of timed event graphs with time window constraints ⋮ Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints ⋮ A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints
This page was built for publication: Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints