Cyclic scheduling in robotic flowshops
From MaRDI portal
Publication:1593526
DOI10.1023/A:1018995317468zbMath0997.90032OpenAlexW2134686833MaRDI QIDQ1593526
Vladimir Kats, Eugene Levner, Joris van de Klundert, Yves Cramer
Publication date: 17 January 2001
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1018995317468
Related Items
Cyclic robot scheduling for 3D printer-based flexible assembly systems ⋮ A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows ⋮ Bicriteria robotic cell scheduling ⋮ Declarative Modeling for Multimodal Processes Driven Distribution Networks ⋮ A note on productivity gains in flexible robotic cells ⋮ Cyclic hoist scheduling in large real-life electroplating lines ⋮ Cyclic multiple-robot scheduling with time-window constraints using a critical path approach ⋮ Converging to periodic schedules for cyclic scheduling problems with resources and deadlines ⋮ Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization ⋮ Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance ⋮ A dynamic scheduling approach for optimizing the material handling operations in a robotic cell ⋮ Scheduling in a three-machine robotic flexible manufacturing cell ⋮ Scheduling in reentrant robotic cells: algorithms and complexity ⋮ Sequencing and scheduling in robotic cells: recent developments ⋮ A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times ⋮ A constraint programming model for the scheduling and workspace layout design of a dual-arm multi-tool assembly robot ⋮ Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint ⋮ Parametric algorithms for 2-cyclic robot scheduling with interval processing times ⋮ Scheduling in robotic cells: process flexibility and cell layout ⋮ Genetic algorithm and its performance analysis for scheduling a single crane ⋮ Cyclic scheduling in robotic flowshops with bounded work-in-process levels ⋮ Bicriteria robotic cell scheduling with controllable processing times ⋮ An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times ⋮ Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints ⋮ Pure cycles in flexible robotic cells ⋮ Identical part production in cyclic robotic cells: Concepts, overview and open questions ⋮ An analysis of cyclic scheduling problems in robot centered cells ⋮ A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times ⋮ Robotic cell scheduling with operational flexibility ⋮ Tabu search algorithms for job-shop problems with a single transport robot ⋮ Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models ⋮ Makespan minimization for flow-shop problems with transportation times and a single robot ⋮ Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots ⋮ Cyclic scheduling of a 2-machine robotic cell with tooling constraints ⋮ Throughput-optimal sequences for cyclically operated plants ⋮ A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case ⋮ Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading ⋮ Robotics and Control Systems ⋮ Bicriteria robotic operation allocation in a flexible manufacturing cell ⋮ An optimization-based heuristic for the robotic cell problem ⋮ Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots ⋮ A review of TSP based approaches for flowshop scheduling ⋮ Robotic-cell scheduling: special polynomially solvable cases of the traveling salesman problem on permuted Monge matrices ⋮ On scheduling cycle shops: Classification, complexity and approximation ⋮ Cycles and permutations in robotic cells ⋮ Scheduling dual gripper robotic cell: one-unit cycles
This page was built for publication: Cyclic scheduling in robotic flowshops