Sequencing and scheduling in robotic cells: recent developments

From MaRDI portal
Publication:880509

DOI10.1007/s10951-005-2861-9zbMath1123.90020OpenAlexW3122485362MaRDI QIDQ880509

H. Neil Geismar, Suresh P. Sethi, Milind W. Dawande, Chelliah Skriskandarajah

Publication date: 15 May 2007

Published in: Journal of Scheduling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10951-005-2861-9



Related Items

Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times, A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows, Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times, Bicriteria robotic cell scheduling, A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times, A note on productivity gains in flexible robotic cells, Cyclic hoist scheduling in large real-life electroplating lines, A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots, Scheduling multiple factory cranes on a common track, Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance, Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization, Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance, A dynamic scheduling approach for optimizing the material handling operations in a robotic cell, Scheduling in a three-machine robotic flexible manufacturing cell, An Optimal Preemptive Algorithm for the Single-Server Parallel-Machine Scheduling with Loading and Unloading Times, Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP), A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times, A constraint programming model for the scheduling and workspace layout design of a dual-arm multi-tool assembly robot, Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint, A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell, Vyacheslav Tanaev: contributions to scheduling and related areas, Parametric algorithms for 2-cyclic robot scheduling with interval processing times, Schedule-allocate and robust sequencing in three-machine robotic cell under breakdowns, Exact methods for the robotic cell problem, Cyclic scheduling in robotic flowshops with bounded work-in-process levels, Bicriteria robotic cell scheduling with controllable processing times, Pure cycles in flexible robotic cells, Identical part production in cyclic robotic cells: Concepts, overview and open questions, Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm, Enumerating split-pair arrangements, MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server, An analysis of cyclic scheduling problems in robot centered cells, Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells, Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models, Parallel machine scheduling with multiple unloading servers, Cyclic scheduling of a 2-machine robotic cell with tooling constraints, Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants, A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case, Online algorithms for scheduling two parallel machines with a single server, Robotics and Control Systems, Bicriteria robotic operation allocation in a flexible manufacturing cell, An optimization-based heuristic for the robotic cell problem, Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots, A review of TSP based approaches for flowshop scheduling, Single-server parallel-machine scheduling with loading and unloading times, Scheduling dual gripper robotic cell: one-unit cycles



Cites Work