Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot
From MaRDI portal
Publication:3637411
DOI10.1287/opre.1030.0073zbMath1165.90443OpenAlexW3124318612MaRDI QIDQ3637411
R. Chandrasekaran, Inna G. Drobouchevitch, Chelliah Skriskandarajah, Suresh P. Sethi
Publication date: 10 July 2009
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.1030.0073
Related Items
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times, A note on productivity gains in flexible robotic cells, Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells, Sequencing and scheduling in robotic cells: recent developments, SOME UNDERLYING MATHEMATICAL DEFINITIONS AND PRINCIPLES FOR CELLULAR MANUFACTURING, MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server, Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells, Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models, Parallel machine scheduling with multiple unloading servers, Transporting jobs through a two‐machine open shop, A review of TSP based approaches for flowshop scheduling, Scheduling dual gripper robotic cell: one-unit cycles