An improved algorithm for cyclic flowshop scheduling in a robotic cell

From MaRDI portal
Publication:1278650

DOI10.1016/S0377-2217(96)00272-XzbMath0919.90088OpenAlexW2078552078MaRDI QIDQ1278650

Vadim E. Levit, Eugene Levner, Vladimir Kats

Publication date: 22 February 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00272-x



Related Items

A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows, Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times, Robust optimization for the cyclic hoist scheduling problem, Cyclic scheduling in a robotic production line, Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance, A branch and bound algorithm for the cyclic job-shop problem with transportation, Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization, Sequencing and scheduling in robotic cells: recent developments, A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell, Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions, Parametric algorithms for 2-cyclic robot scheduling with interval processing times, Cyclic scheduling in robotic flowshops with bounded work-in-process levels, An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times, Identical part production in cyclic robotic cells: Concepts, overview and open questions, Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm, On the existence of dominating 6-cyclic schedules in four-machine robotic cells, Part sequencing in three-machine no-wait robotic cells, A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints, Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells, Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models, A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line, Throughput-optimal sequences for cyclically operated plants, Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times, A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case, Scheduling no-wait robotic cells with two and three machines, Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots, On scheduling cycle shops: Classification, complexity and approximation, A polynomial algorithm for 2-degree cyclic robot scheduling, Scheduling dual gripper robotic cell: one-unit cycles



Cites Work