A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
From MaRDI portal
Publication:1779707
DOI10.1016/j.orl.2003.10.012zbMath1140.90393OpenAlexW2055603202WikidataQ57185943 ScholiaQ57185943MaRDI QIDQ1779707
Publication date: 1 June 2005
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2003.10.012
Related Items
Cyclic hoist scheduling in large real-life electroplating lines ⋮ Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times ⋮ Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions ⋮ Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints ⋮ Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm ⋮ Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
Cites Work