Eugene Levner

From MaRDI portal
Person:238068

Available identifiers

zbMath Open levner.eugene-vMaRDI QIDQ238068

List of research outcomes





PublicationDate of PublicationType
Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm2021-05-05Paper
Entropy-based algorithm for supply-chain complexity assessment2019-10-29Paper
On the existence of dominating 6-cyclic schedules in four-machine robotic cells2018-05-30Paper
An efficient bicriteria algorithm for stable robotic flow shop scheduling2018-05-29Paper
Improving the solution complexity of the scheduling problem with deadlines: A general technique2017-01-12Paper
An approximate binary search algorithm for the multiple-choice knapsack problem2016-06-09Paper
An improved approximation scheme for scheduling a maintenance and proportional deteriorating jobs2015-12-18Paper
THE MAXIMUM TRAVELING SALESMAN PROBLEM ON BANDED MATRICES2015-04-30Paper
An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem2014-08-18Paper
https://portal.mardi4nfdi.de/entity/Q54112712014-04-23Paper
Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions2014-02-05Paper
A note on periodic schedules for linear precedence constraints2013-01-18Paper
An improved FPTAS for mobile agent routing with time constraints2012-09-27Paper
Parametric algorithms for 2-cyclic robot scheduling with interval processing times2011-10-18Paper
Cyclic scheduling in robotic flowshops with bounded work-in-process levels2011-04-29Paper
A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times2011-01-21Paper
A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem2009-11-06Paper
Multi-attribute Text Classification Using the Fuzzy Borda Method and Semantic Grades2009-07-02Paper
https://portal.mardi4nfdi.de/entity/Q36264322009-05-22Paper
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case2009-03-04Paper
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints2008-01-21Paper
An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times2008-01-15Paper
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach2006-12-07Paper
Project Scheduling in AND–OR Graphs: A Generalization of Dijkstra's Algorithm2005-11-11Paper
On fast path-finding algorithms in AND-OR graphs2004-11-16Paper
https://portal.mardi4nfdi.de/entity/Q44531442004-03-07Paper
An Integrated Heuristic Approach to Power-Aware Real-Time Scheduling2003-06-11Paper
A polynomial algorithm for 2-degree cyclic robot scheduling2003-04-10Paper
Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs2002-07-30Paper
https://portal.mardi4nfdi.de/entity/Q45381532002-07-11Paper
An approximation algorithm with performance guarantees for the maximum traveling salesman problem on special matrices2002-06-24Paper
Cyclic scheduling in a robotic production line2002-04-29Paper
https://portal.mardi4nfdi.de/entity/Q44944592001-02-09Paper
Cyclic scheduling in robotic flowshops2001-01-17Paper
Minimizing the number of vehicles in periodic scheduling: The non-Euclidean case2000-09-10Paper
On-line scheduling in a surface treatment system2000-03-19Paper
Optimal control of assembling complexes under predetermined maintenance conditions2000-01-11Paper
An improved algorithm for cyclic flowshop scheduling in a robotic cell1999-02-22Paper
A parametric critical path problem and an application for cyclic scheduling1999-01-25Paper
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots1998-09-27Paper
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling1998-03-18Paper
Minimizing the number of robots to meet a given cyclic schedule1998-01-19Paper
Infinite-horizon scheduling algorithms for optimal search for hidden objects1997-01-19Paper
Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects1996-03-07Paper
Scheduling a two-machine robotic cell: A solvable case1995-08-27Paper
https://portal.mardi4nfdi.de/entity/Q43020841995-04-17Paper
A network flow algorithm for just-in-time project scheduling1995-01-11Paper
A Fast Approximation Algorithm For The Subset-Sum Problem1994-11-29Paper
https://portal.mardi4nfdi.de/entity/Q43130841994-11-10Paper
https://portal.mardi4nfdi.de/entity/Q39793081992-06-26Paper
https://portal.mardi4nfdi.de/entity/Q33585091990-01-01Paper
Scheduling models and methods in optimal freight transportation planning1989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q34765841989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q34766201989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37413921983-01-01Paper
Fast approximation algorithm for job sequencing with deadlines1981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38888461980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38920691980-01-01Paper
https://portal.mardi4nfdi.de/entity/Q30501291979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39074091979-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38920561978-01-01Paper
An effective solution of the Bellman-Johnson problem on a tree-like network1978-01-01Paper
https://portal.mardi4nfdi.de/entity/Q41815701977-01-01Paper
Optimal planning of part's machining on a number of machines1969-01-01Paper

Research outcomes over time

This page was built for person: Eugene Levner