scientific article; zbMATH DE number 1766737
From MaRDI portal
Publication:4538153
DOI10.1016/S0453-4514(99)80022-2zbMATH Open0998.90039OpenAlexW4236992783MaRDI QIDQ4538153FDOQ4538153
Authors: Eugene Levner, Milan Vlach
Publication date: 11 July 2002
Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0453-4514(99)80022-2
Title of this publication is not available (Why is that?)
Recommendations
- scientific article; zbMATH DE number 1487922
- Single machine, scheduling problem with fuzzy precedence relation
- Scheduling with fuzzy delays and fuzzy precedences.
- scientific article; zbMATH DE number 1539051
- Assignment scheduling problem with precedence constraints and un-symmetrical fuzzy processing times
Cited In (13)
- Title not available (Why is that?)
- Batch scheduling problem with due-date and fuzzy precedence relation
- Integer Programming and Combinatorial Optimization
- Assignment scheduling problem with precedence constraints and un-symmetrical fuzzy processing times
- Parallel machine scheduling models with fuzzy parameters and precedence constraints: a credibility approach
- Single machine, scheduling problem with fuzzy precedence relation
- Scheduling with fuzzy delays and fuzzy precedences.
- Title not available (Why is that?)
- single Machine Preemptive Scheduling With Special Cost Functions1
- Single-Machine Scheduling with Precedence Constraints
- Single machine precedence constrained scheduling is a Vertex cover problem
- Parametric precedence relations in single machine scheduling
- Multi-Item Single-Machine Scheduling with Material Supply Constraints
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4538153)