Eugene Levner

From MaRDI portal


List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Optimal bi-criterion planning of rescue and evacuation operations for marine accidents using an iterative scheduling algorithm
Annals of Operations Research
2021-05-05Paper
Entropy-based algorithm for supply-chain complexity assessment
Algorithms
2019-10-29Paper
On the existence of dominating 6-cyclic schedules in four-machine robotic cells
European Journal of Operational Research
2018-05-30Paper
An efficient bicriteria algorithm for stable robotic flow shop scheduling
European Journal of Operational Research
2018-05-29Paper
Improving the solution complexity of the scheduling problem with deadlines: a general technique
RAIRO - Operations Research
2017-01-12Paper
An approximate binary search algorithm for the multiple-choice knapsack problem
Information Processing Letters
2016-06-09Paper
An improved approximation scheme for scheduling a maintenance and proportional deteriorating jobs
Journal of Industrial and Management Optimization
2015-12-18Paper
THE MAXIMUM TRAVELING SALESMAN PROBLEM ON BANDED MATRICES
International Journal of Foundations of Computer Science
2015-04-30Paper
An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem
Journal of Scheduling
2014-08-18Paper
Fast algorithms for mobile agent routing with node-wise constraints in communications networks
 
2014-04-23Paper
Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions
Journal of Scheduling
2014-02-05Paper
A note on periodic schedules for linear precedence constraints
Discrete Applied Mathematics
2013-01-18Paper
An improved FPTAS for mobile agent routing with time constraints
Journal of Universal Computer Science
2012-09-27Paper
Parametric algorithms for 2-cyclic robot scheduling with interval processing times
Journal of Scheduling
2011-10-18Paper
Cyclic scheduling in robotic flowshops with bounded work-in-process levels
Naval Research Logistics
2011-04-29Paper
A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times
European Journal of Operational Research
2011-01-21Paper
A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem
Theoretical Computer Science
2009-11-06Paper
Multi-attribute Text Classification Using the Fuzzy Borda Method and Semantic Grades
Applications of Fuzzy Sets Theory
2009-07-02Paper
Makespan minimization in projects with threshold activities
 
2009-05-22Paper
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
Discrete Applied Mathematics
2009-03-04Paper
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
European Journal of Operational Research
2008-01-21Paper
An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
Operations Research Letters
2008-01-15Paper
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
European Journal of Operational Research
2006-12-07Paper
Project Scheduling in AND–OR Graphs: A Generalization of Dijkstra's Algorithm
Mathematics of Operations Research
2005-11-11Paper
On fast path-finding algorithms in AND-OR graphs
Mathematical Problems in Engineering
2004-11-16Paper
scientific article; zbMATH DE number 2050889 (Why is no real title available?)
 
2004-03-07Paper
An Integrated Heuristic Approach to Power-Aware Real-Time Scheduling
Power-Aware Computer Systems
2003-06-11Paper
A polynomial algorithm for 2-degree cyclic robot scheduling
European Journal of Operational Research
2003-04-10Paper
Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs
Computers & Operations Research
2002-07-30Paper
scientific article; zbMATH DE number 1766737 (Why is no real title available?)
Journal of the Operations Research Society of Japan
2002-07-11Paper
An approximation algorithm with performance guarantees for the maximum traveling salesman problem on special matrices
Discrete Applied Mathematics
2002-06-24Paper
Cyclic scheduling in a robotic production line
Journal of Scheduling
2002-04-29Paper
scientific article; zbMATH DE number 1487922 (Why is no real title available?)
 
2001-02-09Paper
Cyclic scheduling in robotic flowshops
Annals of Operations Research
2001-01-17Paper
Minimizing the number of vehicles in periodic scheduling: The non-Euclidean case
European Journal of Operational Research
2000-09-10Paper
On-line scheduling in a surface treatment system
European Journal of Operational Research
2000-03-19Paper
Optimal control of assembling complexes under predetermined maintenance conditions
Annals of Operations Research
2000-01-11Paper
An improved algorithm for cyclic flowshop scheduling in a robotic cell
European Journal of Operational Research
1999-02-22Paper
A parametric critical path problem and an application for cyclic scheduling
Discrete Applied Mathematics
1999-01-25Paper
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
Computers & Operations Research
1998-09-27Paper
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling
Operations Research Letters
1998-03-18Paper
Minimizing the number of robots to meet a given cyclic schedule
Annals of Operations Research
1998-01-19Paper
Infinite-horizon scheduling algorithms for optimal search for hidden objects
International Transactions in Operational Research
1997-01-19Paper
Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects
The Journal of the Operational Research Society
1996-03-07Paper
Scheduling a two-machine robotic cell: A solvable case
Annals of Operations Research
1995-08-27Paper
scientific article; zbMATH DE number 617941 (Why is no real title available?)
 
1995-04-17Paper
A network flow algorithm for just-in-time project scheduling
European Journal of Operational Research
1995-01-11Paper
A Fast Approximation Algorithm For The Subset-Sum Problem
INFOR: Information Systems and Operational Research
1994-11-29Paper
scientific article; zbMATH DE number 686987 (Why is no real title available?)
 
1994-11-10Paper
scientific article; zbMATH DE number 19804 (Why is no real title available?)
 
1992-06-26Paper
scientific article; zbMATH DE number 4209897 (Why is no real title available?)
 
1990-01-01Paper
Scheduling models and methods in optimal freight transportation planning
Automation and Remote Control
1989-01-01Paper
scientific article; zbMATH DE number 4145650 (Why is no real title available?)
 
1989-01-01Paper
scientific article; zbMATH DE number 4145679 (Why is no real title available?)
 
1989-01-01Paper
scientific article; zbMATH DE number 3976753 (Why is no real title available?)
 
1983-01-01Paper
Fast approximation algorithm for job sequencing with deadlines
Discrete Applied Mathematics
1981-01-01Paper
scientific article; zbMATH DE number 3694944 (Why is no real title available?)
 
1980-01-01Paper
scientific article; zbMATH DE number 3698721 (Why is no real title available?)
 
1980-01-01Paper
scientific article; zbMATH DE number 3644795 (Why is no real title available?)
 
1979-01-01Paper
scientific article; zbMATH DE number 3717131 (Why is no real title available?)
 
1979-01-01Paper
scientific article; zbMATH DE number 3698707 (Why is no real title available?)
 
1978-01-01Paper
An effective solution of the Bellman-Johnson problem on a tree-like network
Automation and Remote Control
1978-01-01Paper
scientific article; zbMATH DE number 3617870 (Why is no real title available?)
 
1977-01-01Paper
Optimal planning of part's machining on a number of machines
Automation and Remote Control
1969-01-01Paper


Research outcomes over time


This page was built for person: Eugene Levner