The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2017.07.012 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2017.07.012 / rank
 
Normal rank

Latest revision as of 01:03, 11 December 2024

scientific article
Language Label Description Also known as
English
The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic
scientific article

    Statements

    The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (English)
    0 references
    0 references
    0 references
    12 July 2018
    0 references
    scheduling
    0 references
    assembly
    0 references
    completion time
    0 references
    heuristics
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references