The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2017.07.012 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2017.07.012 / rank | |||
Normal rank |
Latest revision as of 01:03, 11 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic |
scientific article |
Statements
The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (English)
0 references
12 July 2018
0 references
scheduling
0 references
assembly
0 references
completion time
0 references
heuristics
0 references
0 references
0 references
0 references
0 references
0 references