Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling (Q1869668)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 1902778
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling |
scientific article; zbMATH DE number 1902778 |
Statements
Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling (English)
0 references
28 April 2003
0 references
Heuristics
0 references
parallel machines
0 references
flowshop scheduling
0 references
Makespan
0 references
0 references
0.901721715927124
0 references
0.8926406502723694
0 references
0.8436988592147827
0 references
0.8422666788101196
0 references
0.834936261177063
0 references