Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage (Q4834245)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 758423
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage |
scientific article; zbMATH DE number 758423 |
Statements
Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage (English)
0 references
28 May 1995
0 references
two-stage flow shop scheduling
0 references
parallel machines
0 references
minimum makespan
0 references
heuristics
0 references
worst-case performance
0 references
0.8475539088249207
0 references
0.8368180990219116
0 references
0.8345897793769836
0 references
0.8345897793769836
0 references
0.8339507579803467
0 references