The supplying chain scheduling with the cost constraint and subcontracting (Q471714): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Importer (talk | contribs)
Changed an Item
Property / review text
 
Summary: We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them.
Property / review text: Summary: We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them. / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B06 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C60 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6370022 / rank
 
Normal rank

Revision as of 17:48, 30 June 2023

scientific article
Language Label Description Also known as
English
The supplying chain scheduling with the cost constraint and subcontracting
scientific article

    Statements

    The supplying chain scheduling with the cost constraint and subcontracting (English)
    0 references
    0 references
    0 references
    0 references
    17 November 2014
    0 references
    Summary: We propose an analytical scheduling model with subcontracting. Each job can be processed either on a single machine at a manufacturer or outsourced to a subcontractor, possibly at a higher cost. For a given set of jobs, the decisions the manufacturer needs to make include the selection of a subset of jobs to be outsourced and the schedule of all the jobs. The objective functions are to minimize the commonly used scheduling measures, subject to a constraint on the total production and subcontracting cost. We show the NP-hardiness for the problems with different objective functions and develop dynamic programming algorithms for solving them.
    0 references
    0 references
    0 references
    0 references
    0 references