A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (Q2571194): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Added link to MaRDI item.
links / mardi / namelinks / mardi / name
 

Revision as of 06:57, 3 February 2024

scientific article
Language Label Description Also known as
English
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
scientific article

    Statements

    A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application (English)
    0 references
    0 references
    0 references
    1 November 2005
    0 references
    assembly flowshop
    0 references
    distributed database system
    0 references
    scheduling
    0 references
    maximum lateness
    0 references
    particle swarm optimization
    0 references
    tabu search
    0 references
    heuristic
    0 references

    Identifiers