Multi-phase algorithms for throughput maximization for real-time scheduling (Q1587588): Difference between revisions
From MaRDI portal
Removed claims |
Changed an Item |
||
Property / author | |||
Property / author: Bhaskar Das Gupta / rank | |||
Normal rank | |||
Property / reviewed by | |||
Property / reviewed by: Frits C. R. Spieksma / rank | |||
Normal rank |
Revision as of 05:57, 12 February 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Multi-phase algorithms for throughput maximization for real-time scheduling |
scientific article |
Statements
Multi-phase algorithms for throughput maximization for real-time scheduling (English)
0 references
23 April 2002
0 references
The following scheduling problem is considered: given are \(n\) jobs, and \(m\) machines. To each job \(i\), a profit \(w_i\), a release date \(r_i\), and a deadline \(d_i\) is associated, \(1 \leq i \leq n\). Further, for each job \(i\) and machine \(j\), there is a length \(l_{ij}\), \(1 \leq i \leq n\), \(1 \leq j \leq m\). The problem is to find a maximum-weight feasible schedule, where a schedule is called feasible if no preemption occurs and two jobs on a same machine are not allowed to overlap. The authors provide combinatorial approximation algorithms for this problem and various special cases of it. In particular, a 2-approximation algorithm for the general case is described.
0 references
real-time scheduling
0 references
approximation algorithms
0 references