A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (Q579120): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 00:42, 5 March 2024

scientific article
Language Label Description Also known as
English
A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden
scientific article

    Statements

    A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden (English)
    0 references
    0 references
    0 references
    1987
    0 references
    The concept of job earliness as a measure of inventory costs for single machine scheduling is introduced. The justification of earliness as a cost is presented. It is pointed out that the Japanese have long recognized earliness as a cost. The additon of earliness greatly complicated finding an optimum solution, since reducing earliness may require the insertion of machine idle time. Another measure commonly used to represent inventory cost is flowtime. In this paper, a combination of earliness and flowtime is used to represent total inventory costs. Some preliminary results are presented illustrating the complexity of solving this problem.
    0 references
    job earliness
    0 references
    measure of inventory costs
    0 references
    single machine scheduling
    0 references
    flowtime
    0 references

    Identifiers