A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 02:39, 5 March 2024

scientific article
Language Label Description Also known as
English
A heuristic approach for determining lot sizes and schedules using power-of-two policy
scientific article

    Statements

    A heuristic approach for determining lot sizes and schedules using power-of-two policy (English)
    0 references
    0 references
    0 references
    0 references
    28 July 2008
    0 references
    Summary: We consider the problem of determining realistic and easy-to-schedule lot sizes in a multiproduct, multistage manufacturing environment. We concentrate on a specific type of production, namely, flow shop type production. The model developed consists of two parts, lot sizing problem and scheduling problem. In lot sizing problem, we employ binary integer programming and determine reorder intervals for each product using power-of-two policy. In the second part, using the results obtained of the lot sizing problem, we employ mixed integer programming to determine schedules for a multiproduct, multistage case with multiple machines in each stage. Finally, we provide a numerical example and compare the results with similar methods found in practice.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references