Hybrid rollout approaches for the job shop scheduling problem (Q1014017): Difference between revisions
From MaRDI portal
Changed an Item |
Set profile property. |
||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank |
Revision as of 01:54, 5 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Hybrid rollout approaches for the job shop scheduling problem |
scientific article |
Statements
Hybrid rollout approaches for the job shop scheduling problem (English)
0 references
24 April 2009
0 references
In the paper a rollout approach is applied to the deterministic job shop scheduling problem. The aim is to find a feasible solution for which the makespan is minimized. Several priority dispatch rules and their combinations are considered. A hybrid approach defined by combining a construction heuristic and a local search method is proposed. The computational results are presented. A set of experimental instances is taken from three classes of well known benchmark problems.
0 references
job shop scheduling
0 references
rollout algorithms
0 references
hybrid approach
0 references
priority dispatch rule
0 references
local search methods
0 references