Optimum operation control for multiple machining projects under fixed production interval (Q3511656): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/09720510.2005.10701174 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2041789166 / rank
 
Normal rank

Latest revision as of 22:23, 19 March 2024

scientific article
Language Label Description Also known as
English
Optimum operation control for multiple machining projects under fixed production interval
scientific article

    Statements

    Optimum operation control for multiple machining projects under fixed production interval (English)
    0 references
    0 references
    0 references
    0 references
    11 July 2008
    0 references
    0 references
    material removal rate
    0 references
    calculus of variations
    0 references
    due-date scheduling
    0 references
    multiple projects
    0 references
    dynamic optimization
    0 references
    0 references