Optimum operation control for multiple machining projects under fixed production interval
From MaRDI portal
Publication:3511656
DOI10.1080/09720510.2005.10701174zbMath1146.90389MaRDI QIDQ3511656
Tian-Syung Lan, Kuei-Shu Hsu, Tung-Te Chu
Publication date: 11 July 2008
Published in: Journal of Statistics and Management Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/09720510.2005.10701174
calculus of variations; dynamic optimization; due-date scheduling; material removal rate; multiple projects