Optimum operation control for multiple machining projects under fixed production interval (Q3511656)
From MaRDI portal
!
This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:
scientific article; zbMATH DE number 5299714
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | Optimum operation control for multiple machining projects under fixed production interval |
scientific article; zbMATH DE number 5299714 |
Statements
Optimum operation control for multiple machining projects under fixed production interval (English)
0 references
11 July 2008
0 references
material removal rate
0 references
calculus of variations
0 references
due-date scheduling
0 references
multiple projects
0 references
dynamic optimization
0 references
0.7983713150024414
0 references
0.7800377607345581
0 references
0.7767798900604248
0 references
0.7576494216918945
0 references
0.749884843826294
0 references