Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length (Q1062615): Difference between revisions

From MaRDI portal
m rollbackEdits.php mass rollback
Tag: Rollback
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0377-2217(85)90129-8 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1968233780 / rank
 
Normal rank

Revision as of 09:36, 20 March 2024

scientific article
Language Label Description Also known as
English
Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
scientific article

    Statements

    Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length (English)
    0 references
    0 references
    1985
    0 references
    The problem considered is one of production scheduling of lots of unit- time operations on identical machines. Operations are precedence related and form a tree. For each operation two parameters are specified: the first giving the required number of operations (units of a given product) to be made and the second defining for each arc (i,j) the number of units of product i used to produce a unit of product j. The objective is to find a schedule of minimum length. A polynomial-time algorithm based on Hu's algorithm for scheduling trees is given.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    parallel machines
    0 references
    production scheduling
    0 references
    unit-time operations
    0 references
    identical machines
    0 references
    minimum length
    0 references
    polynomial-time algorithm
    0 references
    0 references