Scheduling for two-stage production system with setup and assembly operations (Q1879793): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Minimizing production flow time in a process and assembly job shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Two-Stage Assembly Scheduling Problem: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for the two-stage assembly scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Games, Critical Paths and Assignment Problems in Permutation Flow Shops and Cyclic Scheduling Flow Line Environments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic scheduling in flow lines: Modeling observations, effective heuristics and a cycle time minimization procedure / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach / rank
 
Normal rank

Latest revision as of 21:00, 6 June 2024

scientific article
Language Label Description Also known as
English
Scheduling for two-stage production system with setup and assembly operations
scientific article

    Statements

    Scheduling for two-stage production system with setup and assembly operations (English)
    0 references
    0 references
    23 September 2004
    0 references
    0 references
    Scheduling
    0 references
    Two-stage production system
    0 references
    Machining operation
    0 references
    Assembly operation
    0 references
    Setup time
    0 references
    Block size
    0 references
    Pseudo-dynamic programming
    0 references