Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (Q706971): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Minimizing production flow time in a process and assembly job shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3938812 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for the two-stage assembly scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Two-Stage Assembly Scheduling Problem: Complexity and Approximation / rank
 
Normal rank
Property / cites work
 
Property / cites work: On general routing problems / rank
 
Normal rank

Latest revision as of 16:58, 7 June 2024

scientific article
Language Label Description Also known as
English
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
scientific article

    Statements

    Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (English)
    0 references
    0 references
    0 references
    9 February 2005
    0 references
    Scheduling
    0 references
    Branch and bound
    0 references
    Flow-shop
    0 references
    Machining operation
    0 references
    Assembly operation
    0 references

    Identifiers