Design and optimization of multi-echelon assembly networks: Savings and potentialities (Q800820): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Improved Heuristics for Multi-Stage Requirements Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic Lot Size Determination in Multi-Stage Assembly Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—On the Optimality of Integer Lot Size Ratios in “Economic Lot Size Determination in Multi-Stage Assembly Systems” / rank
 
Normal rank

Latest revision as of 16:04, 14 June 2024

scientific article
Language Label Description Also known as
English
Design and optimization of multi-echelon assembly networks: Savings and potentialities
scientific article

    Statements

    Design and optimization of multi-echelon assembly networks: Savings and potentialities (English)
    0 references
    0 references
    0 references
    0 references
    1985
    0 references
    In the last decade considerable attention has been paid to the analysis and optimization of multi-echelon assembly networks. Research contributions in this field are mainly focussed on the determination of optimal batch quantities. In this paper two other issues concerning multi-echelon assembly networks are also discussed. The first point concerns the notion of flexibility in assembly operations. Flexibility can be achieved by spending on assembly engineering to cut set-up costs. The second point has to do with design of multilevel assembly systems. Furthermore the notion of minimum network leadtime is introduced. This turns out to be (besides minimal average cost per period) a performance indicator of considerable importance. To conclude an existing Philips product (called MEDSYS) is presented in order to illustrate the ideas discussed in this paper.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    leadtime
    0 references
    lotsizing
    0 references
    resource planning
    0 references
    multi-echelon assembly networks
    0 references
    optimal batch quantities
    0 references
    flexibility in assembly operations
    0 references
    design of multilevel assembly systems
    0 references
    minimum network leadtime
    0 references
    MEDSYS
    0 references