Analysis of a linear programming heuristic for scheduling unrelated parallel machines (Q1061599): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Time bounds for selection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for Scheduling Tasks on Unrelated Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Worst-Case Analysis of Heuristic Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Performance Guarantees for Scheduling Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3285991 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact and Approximate Algorithms for Scheduling Nonidentical Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic Algorithms for Scheduling Independent Tasks on Nonidentical Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4142699 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4197641 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3928233 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Finding the median / rank
 
Normal rank

Revision as of 17:31, 14 June 2024

scientific article
Language Label Description Also known as
English
Analysis of a linear programming heuristic for scheduling unrelated parallel machines
scientific article

    Statements

    Analysis of a linear programming heuristic for scheduling unrelated parallel machines (English)
    0 references
    1985
    0 references
    Each of n jobs is to be processed without interruption on one of m unrelated parallel machines. The objective is to minimize the maximum completion time. A heuristic method is presented, the first stage of which uses linear programming to form a partial schedule leaving at most m-1 jobs unscheduled: the second stage schedules these m-1 jobs using an enumerative method. For \(m\geq 3\), it is shown that the heuristic has a (best possible) worst-case performance ratio of 2 and has a computational requirement which is polynomial in n although it is exponential in m. For \(m=2\), it is shown that the heuristic has a (best possible) worst-case performance ratio of \((1+\sqrt{5})/2\) and requires linear time. A modified version of the heuristic is presented for \(m=2\) which is shown to have a (best possible) worst-case performance ratio of 3/2 while still requiring linear time.
    0 references
    unrelated parallel machines
    0 references
    maximum completion time
    0 references
    heuristic method
    0 references
    worst-case performance
    0 references
    0 references

    Identifiers