Single facility scheduling with multiple job classes (Q1105481): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q4658190 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3938812 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal schedules for single facility with two job classes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Programming Approach for Sequencing Groups of Identical Jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Errata / rank
 
Normal rank

Latest revision as of 17:02, 18 June 2024

scientific article
Language Label Description Also known as
English
Single facility scheduling with multiple job classes
scientific article

    Statements

    Single facility scheduling with multiple job classes (English)
    0 references
    1988
    0 references
    The one-machine scheduling problem aiming at minimizing the mean flow time is considered. The jobs set is divided into K classes. The processing of a job from class s immediately after the processing of a job from class r requires switching time \(\alpha_{rs}>0\) \((\alpha_{rr}=0)\). A heuristic \(O(nK+n\) log n) algorithm is proposed, where n is the number of jobs. The author failed to establish the worst- case bound for the algorithm. The results of numerical experiments are reported.
    0 references
    one-machine scheduling
    0 references
    mean flow time
    0 references
    switching time
    0 references
    heuristic
    0 references

    Identifiers