An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem (Q875429): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995531 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch \(\&\) bound method for the general-shop problem with sequence dependent setup-times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a single machine to minimize a regular objective function under setup constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact algorithms for scheduling multiple families of jobs on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling chain-structured tasks to minimize makespan and mean flow time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling identical parallel machines to minimize total weighted completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the minimization of total weighted flow time with identical and uniform parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved branching scheme for the branch and bound procedure of scheduling<i>n</i>jobs on<i>m</i>parallel machines to minimize total weighted flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on scheduling multiprocessor tasks with identical processing times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive scheduling on identical parallel machines subject to deadlines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4526975 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs that arrive over time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved bounds on relaxations of a parallel machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3993992 / rank
 
Normal rank
Property / cites work
 
Property / cites work: List scheduling revisited / rank
 
Normal rank

Revision as of 17:13, 25 June 2024

scientific article
Language Label Description Also known as
English
An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem
scientific article

    Statements

    An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem (English)
    0 references
    0 references
    0 references
    0 references
    13 April 2007
    0 references
    identical parallel machine
    0 references
    scheduling
    0 references
    setup time
    0 references
    release dates
    0 references
    lower bound
    0 references
    dominance properties
    0 references
    heuristic
    0 references
    0 references
    0 references
    0 references

    Identifiers