Hybrid two-stage planning for food industry overproduction waste minimization (Q5444533): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A study of scheduling problem in agro-food manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A study of scheduling rules of flexible manufacturing systems: A simulation approach / rank
 
Normal rank

Latest revision as of 16:53, 27 June 2024

scientific article; zbMATH DE number 5240634
Language Label Description Also known as
English
Hybrid two-stage planning for food industry overproduction waste minimization
scientific article; zbMATH DE number 5240634

    Statements

    Hybrid two-stage planning for food industry overproduction waste minimization (English)
    0 references
    0 references
    0 references
    25 February 2008
    0 references
    production planning
    0 references
    food manufacture
    0 references
    waste minimization
    0 references
    sustainable manufacture
    0 references

    Identifiers