Hybrid two-stage planning for food industry overproduction waste minimization (Q5444533): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: A study of scheduling problem in agro-food manufacturing systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A study of scheduling rules of flexible manufacturing systems: A simulation approach / rank | |||
Normal rank |
Latest revision as of 16:53, 27 June 2024
scientific article; zbMATH DE number 5240634
Language | Label | Description | Also known as |
---|---|---|---|
English | Hybrid two-stage planning for food industry overproduction waste minimization |
scientific article; zbMATH DE number 5240634 |
Statements
Hybrid two-stage planning for food industry overproduction waste minimization (English)
0 references
25 February 2008
0 references
production planning
0 references
food manufacture
0 references
waste minimization
0 references
sustainable manufacture
0 references