Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back (Q833563): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A Production Line that Balances Itself / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines / rank
 
Normal rank

Latest revision as of 21:49, 1 July 2024

scientific article
Language Label Description Also known as
English
Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back
scientific article

    Statements

    Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back (English)
    0 references
    0 references
    0 references
    0 references
    14 August 2009
    0 references
    0 references
    production/Scheduling
    0 references
    bucket brigade lines
    0 references
    analysis of dynamical systems
    0 references
    0 references