Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back
From MaRDI portal
Publication:833563
DOI10.1016/J.ORL.2009.02.004zbMATH Open1167.90508OpenAlexW2081444190MaRDI QIDQ833563FDOQ833563
Authors: Karthik S. Gurumoorthy, Arunava Banerjee, Anand Paul
Publication date: 14 August 2009
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2009.02.004
Recommendations
- Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines
- Some new results on the analysis and simulation of bucket brigades (self-balancing production lines)
- Two-worker blocking congestion model with walk speed \(m\) in a no-passing circular passage system
- Minimizing the number of workers in a paced mixed-model assembly line
- Throughput analysis of two-stage manufacturing systems with merge and blocking
- Stability of Two-Stage Queues with Blocking
- Benders' decomposition based exact solution method for multi-manned assembly line balancing problem with walking workers
- Exact analysis of a two-workstation one-buffer flow line with parallel unreliable machines
- Balancing of simple assembly lines under variations of task processing times
Cites Work
Cited In (3)
This page was built for publication: Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q833563)