Optimal production run time for two-stage production system with imperfect processes and allowable shortages (Q441026): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q4549958 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimal production run time with imperfect production processes and allowable shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production Lot Sizing with Machine Breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint investment in quality improvement and setup reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of a production-inventory system with machine breakdowns and shutdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3517724 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal batch sizing in a multi-stage production system with rework consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems / rank
 
Normal rank

Latest revision as of 14:34, 5 July 2024

scientific article
Language Label Description Also known as
English
Optimal production run time for two-stage production system with imperfect processes and allowable shortages
scientific article

    Statements

    Optimal production run time for two-stage production system with imperfect processes and allowable shortages (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    20 August 2012
    0 references
    0 references
    two-stage production system
    0 references
    imperfect processes
    0 references
    0 references