A model for bus crew scheduling problem with multiple duty types (Q714275): Difference between revisions
From MaRDI portal
Set OpenAlex properties. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: An extension of set partitioning with application to scheduling problems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Set partitioning/covering-based approaches for the integrated vehicle and crew scheduling problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A dynamic programming based algorithm for the crew scheduling problem. / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Multiobjective Metaheuristics for the Bus Driver Scheduling Problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Column Generation Approach to the Urban Transit Crew Scheduling Problem / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A tree search algorithm for the crew scheduling problem / rank | |||
Normal rank |
Latest revision as of 18:48, 5 July 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A model for bus crew scheduling problem with multiple duty types |
scientific article |
Statements
A model for bus crew scheduling problem with multiple duty types (English)
0 references
19 October 2012
0 references
Summary: We present an approach for solving the bus crew scheduling problem which considers early, day, and late duty modes with time shift and work intensity constraints. Furthermore, the constraint with the least crew number of a certain duty (e.g., day duty) has also been considered. An optimization model is formulated as a \(0\)-\(1\) integer programming problem to improve the efficiency of crew scheduling at the minimum expense of total idle time of crew for a circle bus line. Correspondingly, a heuristic algorithm utilizing the tabu search algorithm has been proposed to solve the model. Finally, the proposed model and algorithm are successfully tested by a case study.
0 references
bus crew scheduling problem
0 references
0 references