A common cycle approach for solving the economic lot and inspection scheduling problem (Q2358853): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Optimal inspection and economical production quantity strategy for an imperfect production process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot sizing and testing for items with uncertain quality / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Economic Lot Scheduling Problem (ELSP): Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inspection scheduling for imperfect production processes under free repair warranty contract / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5724367 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production run time for a deteriorating production system under an extended inspection policy / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid genetic algorithm for group technology economic lot scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A generalized economic model for joint determination of production run, inspection schedule and control chart design / rank
 
Normal rank
Property / cites work
 
Property / cites work: A profit-maximizing economic lot scheduling problem with price optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A basic period approach to the economic lot scheduling problem with shelf life considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A search heuristic for the sequence-dependent economic lot scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal lot size and inspection policy for products sold with warranty / rank
 
Normal rank

Latest revision as of 23:30, 13 July 2024

scientific article
Language Label Description Also known as
English
A common cycle approach for solving the economic lot and inspection scheduling problem
scientific article

    Statements

    A common cycle approach for solving the economic lot and inspection scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    16 June 2017
    0 references
    inventory
    0 references
    lot
    0 references
    size
    0 references
    inspection
    0 references
    search algorithm
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references